{"id":43,"date":"2015-05-25T14:58:24","date_gmt":"2015-05-25T12:58:24","guid":{"rendered":"http:\/\/ndikbbi.com\/new\/?page_id=43"},"modified":"2019-02-21T11:05:47","modified_gmt":"2019-02-21T09:05:47","slug":"%d0%b2%d1%96%d0%b4%d0%bd%d0%be%d0%b2%d0%bb%d0%b5%d0%bd%d0%bd%d1%8f-%d0%bb%d1%96%d0%ba%d0%b2%d1%96%d0%b4%d0%be%d0%b2%d0%b0%d0%bd%d0%b8%d1%85%d0%bd%d0%b5%d0%b4%d1%96%d1%8e%d1%87%d0%b8%d1%85-%d1%81","status":"publish","type":"page","link":"https:\/\/ndikbbi.com\/en\/%d0%bd%d0%b0%d0%bf%d1%80%d1%8f%d0%bc%d0%ba%d0%b8-%d0%b4%d1%96%d1%8f%d0%bb%d1%8c%d0%bd%d0%be%d1%81%d1%82%d1%96\/%d0%b2%d1%96%d0%b4%d0%bd%d0%be%d0%b2%d0%bb%d0%b5%d0%bd%d0%bd%d1%8f-%d0%bb%d1%96%d0%ba%d0%b2%d1%96%d0%b4%d0%be%d0%b2%d0%b0%d0%bd%d0%b8%d1%85%d0%bd%d0%b5%d0%b4%d1%96%d1%8e%d1%87%d0%b8%d1%85-%d1%81\/","title":{"rendered":"Sidetracking from Abandoned\/Suspended Wells"},"content":{"rendered":"<p><a href=\"http:\/\/ndikbbi.com\/wp-content\/uploads\/2015\/05\/vidnovl-1.png\"><img loading=\"lazy\" class=\" size-medium wp-image-44 alignleft\" src=\"http:\/\/ndikbbi.com\/wp-content\/uploads\/2015\/05\/vidnovl-1-88x300.png\" alt=\"vidnovl-1\" width=\"88\" height=\"300\" srcset=\"https:\/\/ndikbbi.com\/wp-content\/uploads\/2015\/05\/vidnovl-1-88x300.png 88w, https:\/\/ndikbbi.com\/wp-content\/uploads\/2015\/05\/vidnovl-1.png 181w\" sizes=\"(max-width: 88px) 100vw, 88px\" \/><\/a> Our engineers have being successfully exploiting the sidetracking technology in abandoned wells by means of casing\u2019s window milling in production casing sizes from 5\u201d to 6-5\/8\u201d and sidetracking from there with either directional or horizontal hole and its further casing and cementing. It is included the following steps:<\/p>\n<ul>\n<li><a href=\"http:\/\/ndikbbi.com\/wp-content\/uploads\/2015\/05\/vidnovl-2.png\"><img loading=\"lazy\" class=\" wp-image-45 alignright\" src=\"http:\/\/ndikbbi.com\/wp-content\/uploads\/2015\/05\/vidnovl-2.png\" alt=\"vidnovl-2\" width=\"162\" height=\"142\" \/><\/a>Isolating the production casing from below the place of proposed sidetrack;<\/li>\n<li>Casing window or section milling;<\/li>\n<li>Oriented side tracking;<\/li>\n<li>Drilling of directional or horizontal section with required horizontal displacement from the old hole;<\/li>\n<li>Running liners of 2-7\/8\u201d \u2013 to 4-1\/2\u201d and its cementing;<\/li>\n<li>Flow intake.<\/li>\n<\/ul>\n<h3>Sidetracking in abandoned\/suspended wells with horizontal or subhorizontal sections<\/h3>\n<p><a href=\"http:\/\/ndikbbi.com\/wp-content\/uploads\/2015\/05\/vidnovl-3.jpg\"><img loading=\"lazy\" class=\" size-medium wp-image-47 alignright\" src=\"http:\/\/ndikbbi.com\/wp-content\/uploads\/2015\/05\/vidnovl-3-218x300.jpg\" alt=\"vidnovl-3\" width=\"218\" height=\"300\" srcset=\"https:\/\/ndikbbi.com\/wp-content\/uploads\/2015\/05\/vidnovl-3-218x300.jpg 218w, https:\/\/ndikbbi.com\/wp-content\/uploads\/2015\/05\/vidnovl-3-743x1024.jpg 743w, https:\/\/ndikbbi.com\/wp-content\/uploads\/2015\/05\/vidnovl-3.jpg 830w\" sizes=\"(max-width: 218px) 100vw, 218px\" \/><\/a> Firstly in CIS on the depth of over 4000 \u043c in 5-1\/2\u201d casing the window was milled and sidetrack section was drilled to depth 4770 \u043c. 4\u201d liner was successfully ran and cemented.<\/p>\n<p>The following wells were successfully sidetracked with horizontal or directional sections from 5-1\/2\u201d, 5-3\/4\u201d, 6-5\/8\u201d 9-5\/8\u201d casings:<\/p>\n<ul>\n<li>the Yablunivska-96, 97\u00a0 (2013)<\/li>\n<li>the \u041arasnozayarska-468\u00a0 (2013)<\/li>\n<li>the Fontanivska-13\u00a0 (2012)<\/li>\n<li>the Nothern-Dolyna-185\u00a0 (2001)<\/li>\n<li>the \u041a\u0430chanivska-155,23,201,60,66\u00a0 (2000-2005)<\/li>\n<\/ul>\n<p>For Karpatygaz LLC we had sidetracked the Yablunivska-96 and 97 wells with horizontal sections in 2013:<br \/>\n<a href=\"http:\/\/ndikbbi.com\/wp-content\/uploads\/2015\/05\/vidnovl-4.jpg\"><img loading=\"lazy\" class=\" size-medium wp-image-56 aligncenter\" src=\"http:\/\/ndikbbi.com\/wp-content\/uploads\/2015\/05\/vidnovl-4-300x148.jpg\" alt=\"vidnovl-4\" width=\"300\" height=\"148\" srcset=\"https:\/\/ndikbbi.com\/wp-content\/uploads\/2015\/05\/vidnovl-4-300x148.jpg 300w, https:\/\/ndikbbi.com\/wp-content\/uploads\/2015\/05\/vidnovl-4-1024x505.jpg 1024w, https:\/\/ndikbbi.com\/wp-content\/uploads\/2015\/05\/vidnovl-4.jpg 1211w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<h3>Sidetracking from abandoned\/suspended wells<\/h3>\n<p>First in CIS on the Fontanivske field the window was milled and the sidetrack was performed from the 5-1\/2\u201d casing under HPHT conditions with mud weight 1.85 gr\/sm3.<\/p>\n<figure id=\"attachment_57\" aria-describedby=\"caption-attachment-57\" style=\"width: 300px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/ndikbbi.com\/wp-content\/uploads\/2015\/05\/vidnovl-6.png\"><img loading=\"lazy\" class=\"wp-image-57 size-medium\" src=\"http:\/\/ndikbbi.com\/wp-content\/uploads\/2015\/05\/vidnovl-6-300x146.png\" alt=\"Well plan and profile \u211613-Fontanivska\" width=\"300\" height=\"146\" srcset=\"https:\/\/ndikbbi.com\/wp-content\/uploads\/2015\/05\/vidnovl-6-300x146.png 300w, https:\/\/ndikbbi.com\/wp-content\/uploads\/2015\/05\/vidnovl-6-1024x497.png 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-57\" class=\"wp-caption-text\">The Fontanivska-13 well plan and profile<\/figcaption><\/figure>\n<h3>Our sidetracking experience in Ukraine<\/h3>\n<p><a href=\"http:\/\/ndikbbi.com\/wp-content\/uploads\/2019\/02\/vidnovl-rez_1_eng.png\"><img loading=\"lazy\" class=\"alignnone wp-image-264 size-medium\" src=\"http:\/\/ndikbbi.com\/wp-content\/uploads\/2019\/02\/vidnovl-rez_1_eng-300x172.png\" alt=\"\" width=\"300\" height=\"172\" srcset=\"https:\/\/ndikbbi.com\/wp-content\/uploads\/2019\/02\/vidnovl-rez_1_eng-300x172.png 300w, https:\/\/ndikbbi.com\/wp-content\/uploads\/2019\/02\/vidnovl-rez_1_eng-768x440.png 768w, https:\/\/ndikbbi.com\/wp-content\/uploads\/2019\/02\/vidnovl-rez_1_eng.png 929w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Our engineers have being successfully exploiting the sidetracking technology in abandoned wells by means of casing\u2019s window milling in production casing sizes from 5\u201d to 6-5\/8\u201d and sidetracking from there with either directional or horizontal hole and its further casing and cementing. It is included the following steps: Isolating the production casing from below the &hellip; <a href=\"https:\/\/ndikbbi.com\/en\/%d0%bd%d0%b0%d0%bf%d1%80%d1%8f%d0%bc%d0%ba%d0%b8-%d0%b4%d1%96%d1%8f%d0%bb%d1%8c%d0%bd%d0%be%d1%81%d1%82%d1%96\/%d0%b2%d1%96%d0%b4%d0%bd%d0%be%d0%b2%d0%bb%d0%b5%d0%bd%d0%bd%d1%8f-%d0%bb%d1%96%d0%ba%d0%b2%d1%96%d0%b4%d0%be%d0%b2%d0%b0%d0%bd%d0%b8%d1%85%d0%bd%d0%b5%d0%b4%d1%96%d1%8e%d1%87%d0%b8%d1%85-%d1%81\/\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Sidetracking from Abandoned\/Suspended Wells<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":28,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"_links":{"self":[{"href":"https:\/\/ndikbbi.com\/en\/wp-json\/wp\/v2\/pages\/43"}],"collection":[{"href":"https:\/\/ndikbbi.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/ndikbbi.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/ndikbbi.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ndikbbi.com\/en\/wp-json\/wp\/v2\/comments?post=43"}],"version-history":[{"count":16,"href":"https:\/\/ndikbbi.com\/en\/wp-json\/wp\/v2\/pages\/43\/revisions"}],"predecessor-version":[{"id":268,"href":"https:\/\/ndikbbi.com\/en\/wp-json\/wp\/v2\/pages\/43\/revisions\/268"}],"up":[{"embeddable":true,"href":"https:\/\/ndikbbi.com\/en\/wp-json\/wp\/v2\/pages\/28"}],"wp:attachment":[{"href":"https:\/\/ndikbbi.com\/en\/wp-json\/wp\/v2\/media?parent=43"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}